Campaign for ending load-shedding to continue: Minister Sharma

कार्तिक २५, २०७३ मा प्रकाशित | 511 views

<p>A load-shedding free campaign started by the government in the Kathmandu Valley as a trial is to be expanded gradually to places outside the Valley as well. <br><br>Speaking at a press meet at the Energy Ministry today, Minister Janardan Sharma said the Nepal Electricity Authority (NEA) is technically in the position of continuing the no-power outage drive in the future, too.<br><br>Discussions are underway to determine possible alternative sources for power and to import additional electricity from India, he said.<br><br>Refuting rumours that the NEA is providing regular power supply to the capital by increasing load-shedding hours outside the Valley, he said the constructions of the Chameliya, Kulekhani III and the Upper Trishuli 3 'A' projects are going on war-footing level. &nbsp;<br><br><br></p>

प्रतिक्रिया

सम्बन्धित खवर

ताजा समाचार

&copy 2026 TopNepalNews. All Rights Reserved. Maintained by Trishuli Web